Traveller Scout Campaign Ep5 - Departure for first system survey
Youtube Link: https://youtu.be/RzWbQjOyXkM Carol was relieved that they were finally leaving for their first survey. The dry run survey of the system planet had unearthed a number of problems with equipment which revealed that the Scout Base's support crew were either incompetent and/or purposely lazy. That’s why she insisted on and ensured the ship and equipment were given a thorough check before leaving on this survey. Luckily a Jump Drive miscalibration was identified and resolved - it probably would not have prevented operations but it was better to address it before departure. And it gave them 3 days to review the rest of the ship and equipment. She still expected more problems during the mission but hopefully, the major issues had been resolved. Bob the Astrogator was covering comms, while Sonny kept an eye on the engines. Mary was busy doing prep for the upcoming survey. Bob called out "We have clearance for departure from base control." Carol was ready to get awa...